Submission History: ERECTION OF SINGLE WIND TURBINE (HUB HEIGHT 49 METRES, ROTOR DIAMETER 56 METRES, AND MAXIMUM TOTAL TIP HEIGHT OF 77 METRES), WITH ASSOCIATED FOUNDATION, HARD STANDING, TRANSFORMER AND ACCESS TRACK (500KW) AT GLENHEAD FARM, CALIFORNIA, FALKIRK FK1 2DG FOR MR THOMAS MILLER - P/12/0002/FUL (CONTINUATION)
This is the history for the submission "ERECTION OF SINGLE WIND TURBINE (HUB HEIGHT 49 METRES, ROTOR DIAMETER 56 METRES, AND MAXIMUM TOTAL TIP HEIGHT OF 77 METRES), WITH ASSOCIATED FOUNDATION, HARD STANDING, TRANSFORMER AND ACCESS TRACK (500KW) AT GLENHEAD FARM, CALIFORNIA, FALKIRK FK1 2DG FOR MR THOMAS MILLER - P/12/0002/FUL (CONTINUATION)".
It shows every meeting that the submission went before and links to the agenda for those meetings.
Committee | Meeting | View Agenda |
Planning | 22/08/2012 | Click here |